Between CO 12 and I-25 Business; 7th Street (10 miles west of the Walsenburg area) from Mile Point 294.4 to Mile Point 305.3. Right shoulder closed due to road construction. Width limit in effect. Width limit 13'0". Starting Friday at 6:00AM MDT until Friday, at about 8:00PM MDT. Full schedule below: • July 24, 6:00AM - July 24, 8:00PM Comment: Intermittent shoulder closures, mobile closures, one-lane alternating traffic, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Between Exit 90: CO 13; Rifle (near Rifle) and US 6 (3 miles west of the Rifle area) from Mile Point 87 to Mile Point 83. Right lane closed due to paving operations. Width limit in effect. Width limit 12'0". Starting July 24, 2026 at 6:00AM MDT until July 24, 2026 at about 4:00PM MDT. Full schedule below: • July 24, 6:00AM - July 24, 4:00PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound use Exit 81 and westbound use Exit 87. For more information email: [email protected]. Between US 6 (3 miles west of the Rifle area) and Exit 90: CO 13; Rifle (near Rifle) from Mile Point 83 to Mile Point 87. Paving operations. Width limit in effect. Width limit 12'0". Starting July 24, 2026 at 6:00AM MDT until July 24, 2026 at about 4:00PM MDT. Full schedule below: • July 24, 6:00AM - July 24, 4:00PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound use Exit 81 and westbound use Exit 87. For more information email: [email protected].