Gold Mountain Fire · Evacuation orders in effect. If your zone is set to Evacuate, leave now.
DetailsBetween South Mineral and US Basin Brooklyns / 825 (4 to 6 miles north of the Silverton area) from Mile Point 75 to Mile Point 77. Road maintenance operations. There is alternating traffic. Slower speeds are advised. Comment: HWY 550 MP 75-77ATL traffic reduced speeds 40MPH, for mud slide debris
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July