US-550N closed · Road · San Juan County · 3m ago
Western Slope · Colorado
2943 resolved alerts kept for reference
Between Exit 90: CO 13; Rifle (near Rifle) and US 6 (3 miles west of the Rifle area) from Mile Point 87 to Mile Point 83. Right lane closed due to paving operations. Width limit in effect. Width limit 12'0". Starting July 23, 2026 at 6:00AM MDT until July 23, 2026 at about 4:00PM MDT. Full schedule below: • July 23, 6:00AM - July 23, 4:00PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound use Exit 81 and westbound use Exit 87. For more information email: [email protected]. Between US 6 (3 miles west of the Rifle area) and Exit 90: CO 13; Rifle (near Rifle) from Mile Point 83 to Mile Point 87. Paving operations. Width limit in effect. Width limit 12'0". Starting July 23, 2026 at 6:00AM MDT until July 23, 2026 at about 4:00PM MDT. Full schedule below: • July 23, 6:00AM - July 23, 4:00PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound use Exit 81 and westbound use Exit 87. For more information email: [email protected].
Between CO 120 (1 mile east of the Penrose area) and Purcell Boulevard (Pueblo West) from Mile Point 296.26 to Mile Point 307.4. Right lane closed due to paving operations. Width limit in effect. Width limit 15'0". Starting July 23, 2026 at 6:00AM MDT until July 23, 2026 at about 8:00PM MDT. Full schedule below: • July 23, 6:00AM - July 23, 8:00PM Comment: Speed reduced to 55 mph. For more information email: [email protected].
Between CO 119 (3 miles west of the Golden area) and CO 58; CO 93 (near Golden) from Mile Point 267.5 to Mile Point 271. Road construction. Alternating traffic. Starting July 23, 2026 at 5:30AM MDT until July 23, 2026 at about 6:30PM MDT. Full schedule below: • July 23, 5:30AM - July 23, 6:30PM Comment: Motorists can expect alternating lanes as work continues on the Huntsman Gulch Segment of the Peaks to Plains project. The lane closure will not extend the entire distance, but will shift throughout the week as work progresses. For more information, contact [email protected].
Between Exit 180: East Vail (Vail) and Exit 190: Vail Pass Summit (near Copper Mountain) from Mile Point 180 to Mile Point 189.98. Left lane closed due to road construction. Starting July 23, 2026 at 5:00AM MDT until July 23, 2026 at about 10:00AM MDT. Full schedule below: • July 23, 5:00AM - July 23, 10:00AM Comment: Use both lanes to merge point.
Between Exit 190: Vail Pass Summit (near Copper Mountain) and Exit 180: East Vail (Vail) from Mile Point 189.98 to Mile Point 180. Left lane closed due to road construction. Starting July 23, 2026 at 5:00AM MDT until July 23, 2026 at about 10:00PM MDT. Full schedule below: • July 23, 5:00AM - July 23, 10:00PM Comment: Use both lanes to merge point.
The Flash Flood Watch will expire for portions of Colorado and Utah. The flash flooding threat has ended for early this morning. Therefore, the Flash Flood Watch will expire at 3 AM MDT early this morning.
The Flood Advisory has been cancelled and is no longer in effect.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 23, 2026 at 12:01AM MDT until July 23, 2026 at about 11:59PM MDT. Full schedule below: • July 23, 12:01AM - July 23, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 23, 2026 at 12:00AM MDT until July 23, 2026 at about 11:59PM MDT. Full schedule below: • July 23, 12:00AM - July 23, 11:59PM