Western Slope · Colorado
2051 resolved alerts kept for reference
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.