At a glance

The City of Grand Junction lists traffic restrictions for projects like the Crosby Avenue Improvements and Four Canyons Parkway for the week of October 19, 2026.

City of Grand Junction Projects with Travel Restrictions

Crosby Avenue Improvements Project

  • Crosby Ave. will be closed between W. Main St. and American Way.

  • Business and local traffic access will be maintained.

  • Follow all posted detour signs, traffic control devices, and directions from traffic control personnel.

Four Canyons Parkway Project

  • October 17 (7 a.m. to 4:30 p.m.): Traffic signal outage at Patterson Road for new signal tower installation.

  • Patterson Road will be reduced to one lane in each direction during signal work.

  • 25 Road will be reduced to one lane in each direction through the intersection.

  • Left turns from Westbound Patterson Road onto Southbound 25 Road will not be permitted during signal work.

D 1/2 Rd. Capacity Improvements Project

  • D ½ Rd. will be closed between 29 Rd. and 30 Rd. Access will be maintained for local traffic.

  • Access to and from San Juan St. will be closed at the intersection of San Juan St. and D ½ Rd.

  • Detours are in place; access to San Juan is available via 29 ½ Rd. from D Rd.

  • Follow all posted detour signs, traffic control devices, and directions from traffic control personnel.

Holiday Tree Lighting

  • Beginning Monday, city crews will be installing holiday lights on Main Street.

  • Expect full block closures at the West end of Main Street (200-300 blocks) as crews work east over the next three weeks.

Patterson Rd. & Pheasant Trail Ct. Sidewalk Repair

  • Westbound Patterson Rd. will have a lane shift at Pheasant Trail Ct. through Beechwood St. (Center turning lane will be closed.)

  • Please be aware and courteous of construction workers.

Non-City Project with Travel Restrictions

  • CDOT - Ute & Pitkin Improvements (I-70B East of Third Street Improvement Project)

  • 5th St. will be reduced to one lane between South Ave. and Colorado Ave.

  • Single-lane closures and shoulder closures will be in effect on Ute Ave. and Pitkin Ave. between 3rd St. and 6th St.

  • 4th St. will be reduced to a single lane between Colorado Ave. and Pitkin Ave.

  • All business and residential access will remain open.

  • Parking and access in alleys will remain open.

  • For questions or concerns, call 970-880-0688 or email [email protected]

  • 23 Road & Broadway Roundabout

  • Alcove Drive will be closed at 23 Rd., with detours via Vista Grande Rd. or Columbine Drive to access 23 Rd.

  • Alcove will remain closed for the duration of the project.

  • CO 340 will remain two-way traffic with a 35 MPH speed limit in the work zone.

  • Sidewalk access will be maintained. Please stay clear of active work areas.

  • Expect traffic delays.

  • Redlands 360

  • South Broadway will be one lane at South Camp Rd.

  • The road will be two-way during non-working hours.

  • Flaggers will control alternating traffic.