Resuelta el 22 jul 2026, 4:04 p.m.. Se conserva como referencia.
ModeradoCarreterasThe Slope
I-70W closed
I-70W · Comenzó el 5 jul 2026, 12:00 a.m. · Actualizada hace 18 h
I-70Wzona
5 jul 2026, 12:00 a.m.vigente desde
22 jul 2026, 4:04 p.m.vence
The Slopefuente
Zona de aviso emitida por el Servicio Meteorológico Nacional
Aviso completo
Esta sección todavía no está traducida. Aparece abajo en inglés.
Between US 40; US 24 and Exit 361: US 24; Limon (near Limon) from Mile Point 362 to Mile Point 361.9. The left lane is closed due to bridge maintenance operations. Until July 24, 2026 at about 11:59PM MDT. Full schedule below: • July 5, 12:00AM - July 24, 11:59PM Comment: Beginning 6-22 Left Lane Closure on structures G-22-BD (East Bound) and G-22-BE (West Bound) from Mile post 362 to 361.9. This will be in place 24/7. Bridge Preventative Maintenance work on several structures on I-70 and county road overpasses between Limon and Flagler. June through October 2026.