Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.

Detalles
Resuelta el 22 jul 2026, 3:58 p.m.. Se conserva como referencia.
ModeradoCarreterasChris Mo

US-40W closed

Routt County · Comenzó el 29 jul 2026, 7:00 p.m. · Actualizada hace 6 d

Routt Countyzona
29 jul 2026, 7:00 p.m.vigente desde
22 jul 2026, 3:58 p.m.vence
Chris Mofuente
Zona de aviso emitida por el Servicio Meteorológico Nacional

Aviso completo

Esta sección todavía no está traducida. Aparece abajo en inglés.

Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 29, 2026 at 7:00PM MDT until July 30, 2026 at about 6:00AM MDT. Full schedule below: • July 29, 7:00PM - July 30, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.