Flood Warning · Inundación · Montezuma County · hace 16 h
Western Slope · Colorado
4491 alertas resueltas conservadas como referencia
Entre la Salida 256: Lookout Mountain y la Salida 259: Morrison Road (cerca de Golden) en el Punto de Milla 258.25. La calzada está reabierta al tráfico.
Entre Nathrop North y Fisherman Br Jv (cerca de Nathrop) en el kilómetro 144.5. La carretera está reabierta al tráfico.
* QUÉ...Se esperan temperaturas de hasta 105. * DÓNDE...En Colorado, Grand Valley. En Utah, Sureste de Utah. * CUÁNDO...Desde el mediodía del domingo hasta las 9 PM MDT del lunes. * IMPACTOS...Las altas temperaturas y la alta humedad pueden causar enfermedades por calor.
Entre Robinhood Drive y CO 67 (cerca de Divide) en el Punto de Milla 277. La vía rápida está reabierta al tráfico.
Entre el Cementerio de Centerville y la Carretera del Condado 260 (4 millas al sur del área de Nathrop) en el Punto de Milla 138. La calzada está reabierta al tráfico.
Entre la Carretera del Condado 17 y la Carretera del Condado 3A (Portland) desde el Punto de Milla 98 hasta el Punto de Milla 99. Operaciones de mantenimiento de la carretera. Hay tráfico alterno. Se aconsejan velocidades más bajas. Comentario: velocidad reducida a 40MPH para la limpieza de deslizamientos de tierra
Entre la salida 269A: CO 121/Wadsworth Boulevard y CO 391 (Wheat Ridge) en el punto kilométrico 268.7. La vía está reabierta al tráfico.
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. Left lane closed due to bridge construction. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 5:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325