Gold Mountain Fire · Incendio forestal · Ouray County · hace 16 h
Western Slope · Colorado
1126 alertas resueltas conservadas como referencia
Between Exit 248: Beaver Brook/Floyd Hill and Exit 251: US 40; El Rancho (1 to 2 miles east of the Floyd Hill area) from Mile Point 249 to Mile Point 250. Both shoulders closed due to roadwork. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: More project information is available at 970-401-7734 or [email protected].
Between US 40 and Exit 228: Georgetown (near Georgetown) from Mile Point 230 to Mile Point 228. Both shoulders closed due to roadwork. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: More project information is available at 970-401-7734 or [email protected].
Between Exit 228: Georgetown and US 40 (near Georgetown) from Mile Point 228 to Mile Point 230. Both shoulders closed due to roadwork. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: More project information is available at 970-401-7734 or [email protected].
Between Exit 218: Herman Gulch and Exit 221: Bakerville (4 miles west of the Silver Plume area) from Mile Point 220.5 to Mile Point 221. Both shoulders closed due to roadwork. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: More project information is available at 970-401-7734 or [email protected].
Between Exit 221: Bakerville and Exit 218: Herman Gulch (4 miles west of the Silver Plume area) from Mile Point 221 to Mile Point 220.5. Right lane closed due to roadwork. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: Bakersville chain station closure. More project information is available at 970-401-7734 or [email protected].
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 24, 2026 at 7:00AM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Both shoulders closed due to road construction. Starting Friday at 7:00AM MDT until Friday, at about 6:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 6:00PM
Between Exit 253: Chief Hosa (near Genesee) and Exit 263: Colorado Mills Parkway (near West Pleasant View) from Mile Point 253 to Mile Point 262. Both shoulders closed due to road construction. Starting Friday at 7:00AM MDT until Friday, at about 6:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 6:00PM
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. Left lane closed due to bridge construction. Starting Friday at 7:00AM MDT until Friday, at about 5:00PM MDT. Full schedule below: • July 24, 7:00AM - July 24, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325
Between Exit 105: New Castle and Exit 109: Canyon Creek (1 mile west of the Chacra area) at Mile Point 107. The roadway is reopened to traffic.