Flood Warning · Inundación · Montezuma County · hace 2 d
Western Slope · Colorado
4507 alertas resueltas conservadas como referencia
* WHAT...Flash flooding and debris flows are possible, flooding caused by excessive rainfall over the Gold Mountain Fire is possible. * WHERE...Gold Mountain Fire in Ouray County Colorado, including Dexter and Cutler Creeks and Highway 550. * WHEN...Until 900 PM MDT Wednesday. * IMPACTS...Excessive rainfall is possible over the Gold Mountain Burn Scar which could lead to flash flooding and/or debris flows, particularly along highway 550 between Cutler Creek and Dexter Creek. The debris flow can consist of rock, mud, vegetation and other loose materials. * ADDITIONAL DETAILS... - At 1057 AM MDT, The probability of heavy rainfall will increase after 12 PM this afternoon, lasting through the evening. If thunderstorms develop over the Gold Mountain burn scar, debris flows are likely within Cutler and Dexter Creek drainages, including Highway 550. - http://www.weather.gov/safety/flood
Between Exit 123: Shoshone (3 miles east of the No Name area) and Exit 129: Bair Ranch (6 miles west of the Dotsero area) from Mile Point 122.8 to Mile Point 126. The left lane is closed due to road maintenance operations. Slower speeds are advised.
Between County Road 8 and US Basin Brooklyns / 825 (8 to 9 miles north of the Silverton area) from Mile Point 79 to Mile Point 80. Road maintenance operations. There is alternating traffic. Slower speeds are advised.
Between US 6 and Exit 87: US 6; Rifle (3 miles west of the Rifle area) from Mile Point 83 to Mile Point 86. Right lane closed due to paving operations. Width limit in effect. Width limit 12'0". Starting July 22, 2026 at 9:00AM MDT until July 22, 2026 at about 7:30PM MDT. Full schedule below: • July 22, 9:00AM - July 22, 7:30PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound us Exit 81 and westbound use Exit 87. For more information email: [email protected].
Between Barney Road (2 miles east of the Calhan area) and Smith Ranch Road (2 miles east of the Peyton area) from Mile Point 342.5 to Mile Point 332. Both shoulders closed due to paving operations. Starting July 22, 2026 at 8:30AM MDT until July 22, 2026 at about 9:00PM MDT. Full schedule below: • July 22, 8:30AM - July 22, 9:00PM Comment: More project information is available at 719-347-4606 or [email protected].
The Round Bottom Fire is burning in Moffat County. It was reported on July 22. The latest mapping puts it at 21 acres. The cause is listed as natural. Data comes from the National Interagency Fire Center.
Between County Road M44 and Forest Service Road 516 (4 to 6 miles north of the Placerville area) from Mile Point 89 to Mile Point 91. Road maintenance operations. There is alternating traffic. Slower speeds are advised. Comment: Speeds reduced to 40 MPH
Between County Road 888 and County Road 237B (13 miles west of the Garfield area) at Mile Point 187. Road maintenance operations. Slower speeds are advised.
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Both shoulders closed due to road construction. Starting tomorrow at 7:00AM MDT until tomorrow at about 6:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 6:00PM