Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.
Western Slope · Colorado
2857 alertas resueltas conservadas como referencia
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting July 30, 2026 at 12:00AM MDT until July 30, 2026 at about 11:59PM MDT. Full schedule below: • July 30, 12:00AM - July 30, 11:59PM
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Two right lanes closed due to roadwork. Starting July 29, 2026 at 9:00PM MDT until July 30, 2026 at about 6:00AM MDT. Full schedule below: • July 29, 9:00PM - July 30, 6:00AM
Between CO 9 and Exit 216: US 6; Loveland Pass (6 to 7 miles east of the Dillon area) from Mile Point 213 to Mile Point 214. Left lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 29, 2026 at 8:00PM MDT until July 30, 2026 at about 6:00AM MDT. Full schedule below: • July 29, 8:00PM - July 30, 6:00AM Comment: Eastbound left lane closure for tunnel maintenance.
Between CO 2/Colorado Boulevard and CO 265/Brighton Boulevard (Denver) from Mile Point 276.5 to Mile Point 275.3. Three left lanes closed due to tunnel maintenance. Starting July 29, 2026 at 8:00PM MDT until July 30, 2026 at about 5:00AM MDT. Full schedule below: • July 29, 8:00PM - July 30, 5:00AM
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 29, 2026 at 7:00PM MDT until July 30, 2026 at about 6:00AM MDT. Full schedule below: • July 29, 7:00PM - July 30, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 29, 2026 at 7:00PM MDT until July 29, 2026 at about 7:01PM MDT. Full schedule below: • July 29, 7:00PM - July 29, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to roadwork. Starting July 29, 2026 at 7:00PM MDT until July 29, 2026 at about 9:00PM MDT. Full schedule below: • July 29, 7:00PM - July 29, 9:00PM
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 29, 2026 at 7:00AM MDT until July 29, 2026 at about 7:00PM MDT. Full schedule below: • July 29, 7:00AM - July 29, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 29, 2026 at 7:00AM MDT until July 29, 2026 at about 7:00PM MDT. Full schedule below: • July 29, 7:00AM - July 29, 7:00PM
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 29, 2026 at 7:00AM MDT until July 29, 2026 at about 7:00PM MDT. Full schedule below: • July 29, 7:00AM - July 29, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 29, 2026 at 7:00AM MDT until July 29, 2026 at about 7:00PM MDT. Full schedule below: • July 29, 7:00AM - July 29, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. Left lane closed due to bridge construction. Starting July 29, 2026 at 7:00AM MDT until July 29, 2026 at about 5:00PM MDT. Full schedule below: • July 29, 7:00AM - July 29, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325