US-550N closed · Carreteras · Ouray County · hace 14 min
Western Slope · Colorado
1131 alertas resueltas conservadas como referencia
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 23, 2026 at 12:00AM MDT until July 23, 2026 at about 11:59PM MDT. Full schedule below: • July 23, 12:00AM - July 23, 11:59PM
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting Thursday at 12:00AM MDT until Thursday, at about 11:59PM MDT. Full schedule below: • July 23, 12:00AM - July 23, 11:59PM
Between Forest Service Road 039 and County Road 648 (16 miles east of the Pagosa Springs area) at Mile Point 162. The roadway is reopened to traffic.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Two right lanes closed due to road construction. Starting July 22, 2026 at 9:00PM MDT until July 23, 2026 at about 6:00AM MDT. Full schedule below: • July 22, 9:00PM - July 23, 6:00AM
Between Frenchman Drive and County Road 41 (near Holyoke) at Mile Point 455. Road closed due to bridge construction. Starting Wednesday at 9:00PM MDT until Thursday, at about 5:00AM MDT. Full schedule below: • July 22, 9:00PM - July 23, 5:00AM Comment: Motorists can anticipate a full closure of US 6 with a signed detour directing motorists: Eastbound US 6: Travel east on US 6, north on US 385, northeast on CR 23, south on CR 41, to reconnect with US 6. Westbound US 6: Travel north on CR 41, southwest on CR 23, south on US 385 to reconnect with US 6. Caution: Flaggers will direct traffic at the CR 23 and CR 41 railroad crossing. Be prepared to stop.
Between Exit 216: US 6; Loveland Pass and CO 9 (6 to 7 miles east of the Dillon area) from Mile Point 214 to Mile Point 213. Left lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 22, 2026 at 8:00PM MDT until July 23, 2026 at about 6:00AM MDT. Full schedule below: • July 22, 8:00PM - July 23, 6:00AM Comment: Westbound left lane closure for tunnel maintenance.
Between I-270 and CO 265/Brighton Boulevard (Commerce City) from Mile Point 293 to Mile Point 293.7. Lanes closed due to road construction. The right lane is closed eastbound and the two right lanes are closed westbound. Starting July 22, 2026 at 8:00PM MDT until July 23, 2026 at about 5:00AM MDT. Full schedule below: • July 22, 8:00PM - July 23, 5:00AM
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 22, 2026 at 7:00PM MDT until July 23, 2026 at about 6:00AM MDT. Full schedule below: • July 22, 7:00PM - July 23, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 22, 2026 at 7:00PM MDT until July 22, 2026 at about 7:01PM MDT. Full schedule below: • July 22, 7:00PM - July 22, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to road construction. Starting July 22, 2026 at 7:00PM MDT until July 22, 2026 at about 9:00PM MDT. Full schedule below: • July 22, 7:00PM - July 22, 9:00PM
Between CO 3 and Kirk Lane (1 mile east of the Durango area) from Mile Point 86 to Mile Point 92. Right lane closed due to paving operations. Starting July 22, 2026 at 7:00PM MDT until July 23, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00PM - July 23, 7:00PM Comment: Various eastbound and westbound single lane closures, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Between CO 45 and Wills Boulevard (near Pueblo) at Mile Point 312.09. Right shoulder closed due to traffic signal installation. Starting tomorrow at 7:00PM MDT until Thursday, at about 6:00AM MDT. Full schedule below: • July 22, 7:00PM - July 23, 6:00AM Comment: alternating closures in every direction