Gold Mountain Fire · Incendio forestal · Ouray County · ayer
Western Slope · Colorado
1139 alertas resueltas conservadas como referencia
Between County Road M44 and Forest Service Road 516 (4 to 6 miles north of the Placerville area) from Mile Point 89 to Mile Point 91. Road maintenance operations. There is alternating traffic. Slower speeds are advised. Comment: Speeds reduced to 40 MPH
Between County Road 888 and County Road 237B (13 miles west of the Garfield area) at Mile Point 187. Road maintenance operations. Slower speeds are advised.
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Both shoulders closed due to road construction. Starting tomorrow at 7:00AM MDT until tomorrow at about 6:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 6:00PM
Between Exit 253: Chief Hosa (near Genesee) and Exit 263: Colorado Mills Parkway (near West Pleasant View) from Mile Point 253 to Mile Point 262. Both shoulders closed due to road construction. Starting tomorrow at 7:00AM MDT until tomorrow at about 6:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 6:00PM
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. The left lane is closed due to bridge construction. Until today at about 5:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325
Between Exit 133: Dotsero (near Gypsum) and US 6 (near Eagle) from Mile Point 139 to Mile Point 147. Right lane closed due to paving operations. Width limit in effect. Width limit 11'0". Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Intermittent single lane closures, peed reduced to 55 mph and 10-20 minute delays. For more information email: [email protected].
Between Exit 244: US 6 and Exit 248: Beaver Brook/Floyd Hill (Floyd Hill) from Mile Point 245 to Mile Point 246.5. The right lane is closed due to road construction. Until today at about 5:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 5:00PM Comment: For questions about impacts, email the Project at [email protected] or call 720-994-2368.” to the additional information
Between Exit 221: Bakerville and Exit 218: Herman Gulch (4 miles west of the Silver Plume area) from Mile Point 221 to Mile Point 220.5. Right lane closed due to roadwork. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: Bakersville chain station closure. More project information is available at 970-401-7734 or [email protected].
Between Exit 218: Herman Gulch and Exit 221: Bakerville (4 miles west of the Silver Plume area) from Mile Point 220.5 to Mile Point 221. Both shoulders closed due to roadwork. Starting July 22, 2026 at 7:00AM MDT until July 22, 2026 at about 7:00PM MDT. Full schedule below: • July 22, 7:00AM - July 22, 7:00PM Comment: More project information is available at 970-401-7734 or [email protected].