Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.
Western Slope · Colorado
1125 alertas resueltas conservadas como referencia
Between CO 12 and I-25 Business; 7th Street (10 miles west of the Walsenburg area) from Mile Point 294.4 to Mile Point 305.3. Right shoulder closed due to road construction. Width limit in effect. Width limit 13'0". Starting July 29, 2026 at 6:00AM MDT until July 29, 2026 at about 6:59PM MDT. Full schedule below: • July 29, 6:00AM - July 29, 6:59PM Comment: Intermittent should closures, mobile closures, one-lane alternating traffic, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Between Exit 190: Vail Pass Summit (near Copper Mountain) and Exit 180: East Vail (Vail) from Mile Point 189.98 to Mile Point 180. Left lane closed due to road construction. Starting July 29, 2026 at 5:00AM MDT until July 29, 2026 at about 10:00PM MDT. Full schedule below: • July 29, 5:00AM - July 29, 10:00PM Comment: Use both lanes to merge point.
Between Exit 180: East Vail (Vail) and Exit 190: Vail Pass Summit (near Copper Mountain) from Mile Point 180 to Mile Point 189.98. Left lane closed due to road construction. Starting July 29, 2026 at 5:00AM MDT until July 29, 2026 at about 10:00AM MDT. Full schedule below: • July 29, 5:00AM - July 29, 10:00AM Comment: Use both lanes to merge point.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 29, 2026 at 12:01AM MDT until July 29, 2026 at about 11:59PM MDT. Full schedule below: • July 29, 12:01AM - July 29, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting July 29, 2026 at 12:00AM MDT until July 29, 2026 at about 11:59PM MDT. Full schedule below: • July 29, 12:00AM - July 29, 11:59PM
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 29, 2026 at 12:00AM MDT until July 29, 2026 at about 11:59PM MDT. Full schedule below: • July 29, 12:00AM - July 29, 11:59PM
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 29, 2026 at 12:00AM MDT until July 29, 2026 at about 11:59PM MDT. Full schedule below: • July 29, 12:00AM - July 29, 11:59PM
Between Exit 292: US 36; Airpark Road and E-470 (near Aurora) from Mile Point 291.19 to Mile Point 289.97. Both shoulders closed due to bridge construction. Starting July 29, 2026 at 12:00AM MDT until July 29, 2026 at about 11:59PM MDT. Full schedule below: • July 29, 12:00AM - July 29, 11:59PM
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Two right lanes closed due to roadwork. Starting July 28, 2026 at 9:00PM MDT until July 29, 2026 at about 6:00AM MDT. Full schedule below: • July 28, 9:00PM - July 29, 6:00AM
Between Exit 216: US 6; Loveland Pass and CO 9 (6 to 7 miles east of the Dillon area) from Mile Point 214 to Mile Point 213. Right lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 28, 2026 at 8:00PM MDT until July 29, 2026 at about 6:00AM MDT. Full schedule below: • July 28, 8:00PM - July 29, 6:00AM Comment: Eastbound right lane closure for tunnel maintenance.
Between I-25 and Exit 276A: US 6; Steele Street (Denver) from Mile Point 274.5 to Mile Point 276. Roadway reduced to one lane due to tunnel maintenance. Starting July 28, 2026 at 8:00PM MDT until July 29, 2026 at about 5:00AM MDT. Full schedule below: • July 28, 8:00PM - July 29, 5:00AM
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 28, 2026 at 7:00PM MDT until July 28, 2026 at about 7:01PM MDT. Full schedule below: • July 28, 7:00PM - July 28, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.