Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.
Western Slope · Colorado
1125 alertas resueltas conservadas como referencia
Between County Road CC and CO 17 (8 to 13 miles north of the Saguache area) from Mile Point 95.3 to Mile Point 100.2. The roadway is reopened to traffic.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 28, 2026 at 12:01AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:01AM - July 28, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between Exit 292: US 36; Airpark Road and E-470 (near Aurora) from Mile Point 291.19 to Mile Point 289.97. Both shoulders closed due to bridge construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Two right lanes closed due to roadwork. Starting July 27, 2026 at 9:00PM MDT until July 28, 2026 at about 6:00AM MDT. Full schedule below: • July 27, 9:00PM - July 28, 6:00AM
Between I-25 and Exit 276A: US 6; Steele Street (Denver) from Mile Point 274.5 to Mile Point 276. Two left lanes closed due to tunnel maintenance. Starting July 27, 2026 at 8:00PM MDT until July 28, 2026 at about 5:00AM MDT. Full schedule below: • July 27, 8:00PM - July 28, 5:00AM Comment: All eastbound lanes will be closed for 15 minutes at the top of every hour between 10 p.m. and 4 a.m.
Between Exit 216: US 6; Loveland Pass and CO 9 (6 to 7 miles east of the Dillon area) from Mile Point 214 to Mile Point 213. Right lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 27, 2026 at 8:00PM MDT until July 28, 2026 at about 6:00AM MDT. Full schedule below: • July 27, 8:00PM - July 28, 6:00AM Comment: Eastbound right lane closure for tunnel maintenance.
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 27, 2026 at 7:00PM MDT until July 28, 2026 at about 6:00AM MDT. Full schedule below: • July 27, 7:00PM - July 28, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to roadwork. Starting July 27, 2026 at 7:00PM MDT until July 27, 2026 at about 9:00PM MDT. Full schedule below: • July 27, 7:00PM - July 27, 9:00PM
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 27, 2026 at 7:00PM MDT until July 27, 2026 at about 7:01PM MDT. Full schedule below: • July 27, 7:00PM - July 27, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.