Monte Vista Evacuation · Emergencia civil · Archuleta County · hace 3 h
Western Slope · Colorado
2104 alertas resueltas conservadas como referencia
Between Exit 216: US 6; Loveland Pass and CO 9 (6 to 7 miles east of the Dillon area) from Mile Point 214 to Mile Point 213. Right lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 28, 2026 at 8:00PM MDT until July 29, 2026 at about 6:00AM MDT. Full schedule below: • July 28, 8:00PM - July 29, 6:00AM Comment: Eastbound right lane closure for tunnel maintenance.
Between I-25 and Exit 276A: US 6; Steele Street (Denver) from Mile Point 274.5 to Mile Point 276. Roadway reduced to one lane due to tunnel maintenance. Starting July 28, 2026 at 8:00PM MDT until July 29, 2026 at about 5:00AM MDT. Full schedule below: • July 28, 8:00PM - July 29, 5:00AM
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 28, 2026 at 7:00PM MDT until July 29, 2026 at about 6:00AM MDT. Full schedule below: • July 28, 7:00PM - July 29, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 28, 2026 at 7:00PM MDT until July 28, 2026 at about 7:01PM MDT. Full schedule below: • July 28, 7:00PM - July 28, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to roadwork. Starting July 28, 2026 at 7:00PM MDT until July 28, 2026 at about 9:00PM MDT. Full schedule below: • July 28, 7:00PM - July 28, 9:00PM
Between Redstone Boulevard and Cherokee Lane (3 miles north of the Redstone area) at Mile Point 56.1. The roadway is reopened to traffic.
En la salida 273: Calle Pecos (Denver) en el punto de milla 273. La carretera está reabierta al tráfico.
Entre Rasberry Road y Lewis Lane (cerca de South Fork) en el Punto del Millaje 3. La carretera está reabierta al tráfico.
Between Exit 105: New Castle and Exit 109: Canyon Creek (near New Castle) at Mile Point 106. The roadway is reopened to traffic.
Between Kirk Lane and County Road 223 (5 miles east of the Durango area) at Mile Point 95.1. The roadway is reopened to traffic.
At 158 PM MDT, Doppler radar was tracking a strong thunderstorm 8 miles southwest of Montrose, moving northeast at 15 mph. HAZARD...Wind gusts up to 40 mph and penny size hail. SOURCE...Radar indicated. IMPACT...Gusty winds could knock down tree limbs and blow around unsecured objects. Minor hail damage to vegetation and outdoor objects is possible. Locations impacted include... Montrose. This includes the following highways... U.S. Highway 550 in Colorado between mile markers 123 and 130. U.S. Highway 50 in Colorado between mile markers 84 and 97. Colorado 90 between mile markers 82 and 89.
Between Poncha Hot Spring and County Road 51XX (3 miles south of the Poncha Springs area) at Mile Point 122. The roadway is reopened to traffic.