Flood Warning · Inundación · Montezuma County · hace 8 h
Western Slope · Colorado
2105 alertas resueltas conservadas como referencia
Between Poncha Hot Spring and County Road 51XX (3 miles south of the Poncha Springs area) at Mile Point 122. The roadway is reopened to traffic.
Between Ridge Lane and County Road 7 (2 to 4 miles north of the Fairplay area) from Mile Point 186 to Mile Point 188. The roadway is reopened to traffic.
At 1230 PM MDT, Doppler radar was tracking a strong thunderstorm near Central City, or 33 miles west of Denver, moving east at 5 mph. HAZARD...Wind gusts up to 50 mph and penny size hail. SOURCE...Radar indicated. IMPACT...Gusty winds could knock down tree limbs and blow around unsecured objects. Minor damage to outdoor objects is possible. Locations impacted include... Idaho Springs, Central City, Black Hawk, Aspen Springs, Rollinsville, Pinecliffe, Dumont, Tolland, Eldora and Russell Gulch.
El incendio Stove Canyon está en llamas en el condado de Garfield. Se reportó el 28 de julio. La última cartografía lo ubica en 44 acres. La causa se indica como natural. Los datos provienen del Centro Nacional Interagencial de Incendios.
At Exit 253: Chief Hosa (1 mile west of the Genesee area) at Mile Point 252.3. The roadway is reopened to traffic.
Between County Road 20C and Rainbow Lake Road (10 miles west of the Gunnison area) at Mile Point 145. The roadway is reopened to traffic.
Between US 491 (near Lewis) and County Road 42 (near Mancos) from Mile Point 0 to Mile Point 26. The roadway is reopened to traffic.
Between South Mineral and US Basin Brooklyns / 825 (4 to 6 miles north of the Silverton area) from Mile Point 75 to Mile Point 77. Road maintenance operations. There is alternating traffic. Slower speeds are advised. Comment: HWY 550 MP 75-77ATL traffic reduced speeds 40MPH, for mud slide debris
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM