19000 Blk HWY 145 Pre-Evacuation Order · Emergencia civil · Montezuma County · hace 53 min
Western Slope · Colorado
2106 alertas resueltas conservadas como referencia
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 7:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 7:00PM
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. Left lane closed due to bridge construction. Starting July 28, 2026 at 7:00AM MDT until July 28, 2026 at about 5:00PM MDT. Full schedule below: • July 28, 7:00AM - July 28, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325
Between CO 12 and I-25 Business; 7th Street (10 miles west of the Walsenburg area) from Mile Point 294.4 to Mile Point 305.3. Right shoulder closed due to road construction. Width limit in effect. Width limit 13'0". Starting July 28, 2026 at 6:00AM MDT until July 28, 2026 at about 6:59PM MDT. Full schedule below: • July 28, 6:00AM - July 28, 6:59PM Comment: Intermittent should closures, mobile closures, one-lane alternating traffic, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Above normal temperatures will continue through the mid week period. Continue to use caution during the hottest hours of the day stay hydrated and avoid strenuous activities.
Between Exit 190: Vail Pass Summit (near Copper Mountain) and Exit 180: East Vail (Vail) from Mile Point 189.98 to Mile Point 180. Left lane closed due to road construction. Starting July 28, 2026 at 5:00AM MDT until July 28, 2026 at about 10:00PM MDT. Full schedule below: • July 28, 5:00AM - July 28, 10:00PM Comment: Use both lanes to merge point.
Between Exit 180: East Vail (Vail) and Exit 190: Vail Pass Summit (near Copper Mountain) from Mile Point 180 to Mile Point 189.98. Left lane closed due to road construction. Starting July 28, 2026 at 5:00AM MDT until July 28, 2026 at about 10:00AM MDT. Full schedule below: • July 28, 5:00AM - July 28, 10:00AM Comment: Use both lanes to merge point.
Between County Road CC and CO 17 (8 to 13 miles north of the Saguache area) from Mile Point 95.3 to Mile Point 100.2. The roadway is reopened to traffic.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 28, 2026 at 12:01AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:01AM - July 28, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between Exit 292: US 36; Airpark Road and E-470 (near Aurora) from Mile Point 291.19 to Mile Point 289.97. Both shoulders closed due to bridge construction. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting July 28, 2026 at 12:00AM MDT until July 28, 2026 at about 11:59PM MDT. Full schedule below: • July 28, 12:00AM - July 28, 11:59PM