Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.
Western Slope · Colorado
1125 alertas resueltas conservadas como referencia
* WHAT...High temperatures of 100 to 107 and warm night time lows will bring little relief. * WHERE...In Colorado, Lower Yampa River Basin and Grand Valley. In Utah, Arches/Grand Flat, Eastern Uinta Basin, Canyonlands/Natural Bridges, and Southeast Utah. * WHEN...Until 6 AM MDT Tuesday. * IMPACTS...Heat related illnesses increase significantly during extreme heat events.
Between Smizer Gulch and Wray Gulch Road (27 miles east of the Rangely area) at Mile Point 49. The roadway is reopened to traffic.
Between Exit 216: US 6; Loveland Pass and CO 9 (6 to 7 miles east of the Dillon area) from Mile Point 214 to Mile Point 213. Right lane closed due to tunnel maintenance. Height limit in effect. Width limit in effect. Height limit 13'11". Width limit 12'0". Starting July 26, 2026 at 8:00PM MDT until July 27, 2026 at about 6:00AM MDT. Full schedule below: • July 26, 8:00PM - July 27, 6:00AM Comment: Eastbound right lane closure for tunnel maintenance.
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 26, 2026 at 7:00PM MDT until July 26, 2026 at about 7:01PM MDT. Full schedule below: • July 26, 7:00PM - July 26, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 26, 2026 at 7:00PM MDT until July 27, 2026 at about 6:00AM MDT. Full schedule below: • July 26, 7:00PM - July 27, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to roadwork. Starting July 26, 2026 at 6:00PM MDT until July 26, 2026 at about 8:00PM MDT. Full schedule below: • July 26, 6:00PM - July 26, 8:00PM
Between County Road 17 (Portland) and Mall Road (Ridgway) from Mile Point 98 to Mile Point 104. The roadway is reopened to traffic.
Between Exit 190: Vail Pass Summit and Exit 180: East Vail (Vail) at Mile Point 181. The roadway is reopened to traffic.
Between Lost Creek and County Road 225 (Maysville) at Mile Point 208. The roadway is reopened to traffic.
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 26, 2026 at 7:00AM MDT until July 26, 2026 at about 7:00PM MDT. Full schedule below: • July 26, 7:00AM - July 26, 7:00PM