CO-90E closed · Carreteras · Montrose County · hace 3 min
Western Slope · Colorado
2122 alertas resueltas conservadas como referencia
Between CO 120 (1 mile east of the Penrose area) and Purcell Boulevard (Pueblo West) from Mile Point 296.26 to Mile Point 307.4. Right lane closed due to paving operations. Width limit in effect. Width limit 15'0". Starting July 24, 2026 at 6:00AM MDT until July 24, 2026 at about 8:00PM MDT. Full schedule below: • July 24, 6:00AM - July 24, 8:00PM Comment: Speed reduced to 55 mph. For more information email: [email protected].
Between CO 119 (3 miles west of the Golden area) and CO 58; CO 93 (near Golden) from Mile Point 267.5 to Mile Point 271. Road construction. Alternating traffic. Starting July 24, 2026 at 5:30AM MDT until July 24, 2026 at about 6:30PM MDT. Full schedule below: • July 24, 5:30AM - July 24, 6:30PM Comment: Motorists can expect alternating lanes as work continues on the Huntsman Gulch Segment of the Peaks to Plains project. The lane closure will not extend the entire distance, but will shift throughout the week as work progresses. For more information, contact [email protected].
Between Exit 180: East Vail (Vail) and Exit 190: Vail Pass Summit (near Copper Mountain) from Mile Point 180 to Mile Point 189.98. Left lane closed due to road construction. Starting July 24, 2026 at 5:00AM MDT until July 24, 2026 at about 10:00AM MDT. Full schedule below: • July 24, 5:00AM - July 24, 10:00AM Comment: Use both lanes to merge point.
Between Exit 190: Vail Pass Summit (near Copper Mountain) and Exit 180: East Vail (Vail) from Mile Point 189.98 to Mile Point 180. Left lane closed due to road construction. Starting July 24, 2026 at 5:00AM MDT until July 24, 2026 at about 10:00AM MDT. Full schedule below: • July 24, 5:00AM - July 24, 10:00AM Comment: Use both lanes to merge point.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 24, 2026 at 12:01AM MDT until July 24, 2026 at about 11:59PM MDT. Full schedule below: • July 24, 12:01AM - July 24, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 24, 2026 at 12:00AM MDT until July 24, 2026 at about 11:59PM MDT. Full schedule below: • July 24, 12:00AM - July 24, 11:59PM
Between Exit 292: US 36; Airpark Road and E-470 (near Aurora) from Mile Point 291.19 to Mile Point 289.97. Both shoulders closed due to bridge construction. Starting July 24, 2026 at 12:00AM MDT until July 24, 2026 at about 11:59PM MDT. Full schedule below: • July 24, 12:00AM - July 24, 11:59PM
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 24, 2026 at 12:00AM MDT until July 24, 2026 at about 11:59PM MDT. Full schedule below: • July 24, 12:00AM - July 24, 11:59PM
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting Friday at 12:00AM MDT until Friday, at about 11:59PM MDT. Full schedule below: • July 24, 12:00AM - July 24, 11:59PM
Between Exit 105: New Castle (near New Castle) and Exit 97: Silt (1 mile east of the Silt area) from Mile Point 105.1 to Mile Point 100.5. Road closed expect delays due to safety concerns. Slower speeds are advised. See map for detour(s). Comment: I-70 all Westbound Lanes Closed due to flooding, Use Detour: US-6 to Silt, Expect Delays
Between County Road 41 and County Road 43 (near Holyoke) at Mile Point 456. Bridge construction. Alternating traffic. Width limit in effect. Width limit 12'0". Starting Thursday at 9:00PM MDT until Friday, at about 5:00AM MDT. Full schedule below: • July 23, 9:00PM - July 24, 5:00AM Comment: Motorists can anticipate an alternating single-lane closure with flaggers directing traffic through the shoofly detour – Be prepared to stop. Delays of up to 15 minutes are anticipated. A 12-foot width restriction and 73.5-foot length restriction will remain in place. Caution: Increased construction activity, including construction equipment and trucks entering and exiting.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Two right lanes closed due to road construction. Starting July 23, 2026 at 9:00PM MDT until July 24, 2026 at about 6:00AM MDT. Full schedule below: • July 23, 9:00PM - July 24, 6:00AM