CO-90E closed · Carreteras · Montrose County · hace 1 min
Western Slope · Colorado
2121 alertas resueltas conservadas como referencia
Between I-270 and CO 265/Brighton Boulevard (Commerce City) from Mile Point 293 to Mile Point 293.7. Lanes closed due to road construction. The right lane is closed eastbound and the two right lanes are closed westbound. Starting July 23, 2026 at 8:00PM MDT until July 24, 2026 at about 5:00AM MDT. Full schedule below: • July 23, 8:00PM - July 24, 5:00AM
Between Exit 190: Vail Pass Summit and Exit 195: Copper Mountain (near Copper Mountain) at Mile Point 190.5. The roadway is reopened to traffic.
Between Duckels-Bettger Pit Road (2 miles west of the Steamboat Springs area) and Old US 40 (2 miles east of the Hayden area) from Mile Point 126 to Mile Point 112. Road construction. Alternating traffic. Starting July 23, 2026 at 7:00PM MDT until July 24, 2026 at about 6:00AM MDT. Full schedule below: • July 23, 7:00PM - July 24, 6:00AM Comment: Nighttime paving operations are from 7 p.m. to 6 a.m. Pilot cars are leading vehicles through the work zone. Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, throughout the duration of the project Lane closures, guided by flaggers, will have up to 10-minute delays. The speed limit will be reduced to 40 mph through the work zone. The project is expected to last until the middle of November.
Between US 84 and 14th Street (Pagosa Springs) from Mile Point 144.1 to Mile Point 142.8. Road construction. Starting July 23, 2026 at 7:00PM MDT until July 23, 2026 at about 7:01PM MDT. Full schedule below: • July 23, 7:00PM - July 23, 7:01PM Comment: Two-way traffic continues on the north side of US 160. The Lewis Street and US 160 intersection closure remains in place. Please utilize 4th, 5th, 7th, and 8th Streets as an alternative to access businesses along Lewis Street. The good news is that the complex utility line work will be complete by Friday, June 26th. Crews have completed water utility work, wastewater utility work, stormwater, geothermal, gas, and electrical work.
Between Exit 263: Colorado Mills Parkway (West Pleasant View) and Exit 253: Chief Hosa (near Genesee) from Mile Point 262 to Mile Point 253. Right lane closed due to road construction. Starting July 23, 2026 at 7:00PM MDT until July 23, 2026 at about 9:00PM MDT. Full schedule below: • July 23, 7:00PM - July 23, 9:00PM
Between CO 3 and Kirk Lane (1 mile east of the Durango area) from Mile Point 86 to Mile Point 92. Right lane closed due to paving operations. Starting July 23, 2026 at 7:00PM MDT until July 24, 2026 at about 7:00PM MDT. Full schedule below: • July 23, 7:00PM - July 24, 7:00PM Comment: Various eastbound and westbound single lane closures, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Between Exit 256: Lookout Mountain and Exit 259: Morrison Road (near Golden) at Mile Point 258. The right lane is closed due to police activity.
At CO 72 (Wheat Ridge) at Mile Point 265.7. The roadway is reopened to traffic.
At CO 391 (Wheat Ridge) at Mile Point 267.4. The roadway is reopened to traffic.
At 427 PM MDT, Doppler radar was tracking a strong thunderstorm 20 miles northwest of Parachute, or 46 miles northeast of Grand Junction, moving southeast at 10 mph. HAZARD...Wind gusts up to 50 mph and half inch hail. SOURCE...Radar indicated. IMPACT...Gusty winds could knock down tree limbs and blow around unsecured objects. Minor hail damage to vegetation is possible. This storm will remain over mainly rural areas of southern Rio Blanco and northern Garfield counties.
Between Patton Street and County Road 29 (near Cortez) at Mile Point 41. The right shoulder is closed due to a crash. Slower speeds are advised. Comment: US-160 @ MP 41 shoulder is closed, due to accident, slower speed is advised
Between US 6 and Exit 87: US 6; Rifle (3 miles west of the Rifle area) from Mile Point 83 to Mile Point 86. Right lane closed due to paving operations. Width limit in effect. Width limit 12'0". Starting July 23, 2026 at 9:00AM MDT until July 23, 2026 at about 7:30PM MDT. Full schedule below: • July 23, 9:00AM - July 23, 7:30PM Comment: Speed reduced to 55 mph and up to 20-minute delays. Wide loads detour from I-70 onto US 6, eastbound us Exit 81 and westbound use Exit 87. For more information email: [email protected].