Gold Mountain Fire · Órdenes de evacuación vigentes. Si su zona está en Evacuar, salga ahora.
Western Slope · Colorado
1125 alertas resueltas conservadas como referencia
Between Exit 322: Peoria Road (near Peoria) and Exit 328: I-70 Business South (2 miles east of the Peoria area) from Mile Point 323 to Mile Point 325. Left lane closed due to bridge construction. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 5:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 5:00PM Comment: right and left lane closures on both EB and WB I-70 from MP 323-325
Between Park Street and Mildred Road (Cortez) at Mile Point 39.05. Right lane closed due to traffic signal installation. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM
Between 7th Street and Peach Valley Road (New Castle) from Mile Point 105.9 to Mile Point 105.8. Bridge construction. Alternating traffic. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: One lane alternating traffic over the detour. Occasional traffic holds to position equipment and concrete trucks in the work zone.
Between Exit 216: US 6; Loveland Pass and CO 9 (6 miles east of the Dillon area) from Mile Point 213.2 to Mile Point 206.9. Culvert maintenance operations. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: Traffic Impacts There will be weekday single-lane and shoulder closures on I-70 between Silverthorne (MP/Exit 205) and the Eisenhower Johnson Memorial Tunnel (MP 213). Delays are not expected. There will be no lane closures on Fridays, holidays and weekends. The speed limit will be reduced to 45 MPH through the work zone. No width restrictions are expected on vehicles through the work zone. Motorists should be aware, there are many projects along the I-70 mountain corridor. https://www.codot.gov/projects/i70mountaincorridor/.
Between H25 Road and Confluence Drive (Delta) from Mile Point 70.2 to Mile Point 70.7. Paving operations. Starting July 30, 2026 at 7:00AM MDT until July 30, 2026 at about 7:00PM MDT. Full schedule below: • July 30, 7:00AM - July 30, 7:00PM Comment: Travel Impacts Daytime work hours will be 7 a.m. to 7 p.m., Monday through Friday Vehicles will be reduced to a single-lane, alternating traffic intermittently in either direction, across the Gunnison River bridge. Lane closures, guided by flaggers, will have up to 15-minute delays The speed limit will be reduced to 40 mph through the work zone The project is expected to be complete by the middle of July
Between CO 12 and I-25 Business; 7th Street (10 miles west of the Walsenburg area) from Mile Point 294.4 to Mile Point 305.3. Right shoulder closed due to road construction. Width limit in effect. Width limit 13'0". Starting July 30, 2026 at 6:00AM MDT until July 30, 2026 at about 6:59PM MDT. Full schedule below: • July 30, 6:00AM - July 30, 6:59PM Comment: Intermittent should closures, mobile closures, one-lane alternating traffic, reduced speed to 40 mph and up to 15-minute delays. For more information email: [email protected].
Between Exit 180: East Vail (Vail) and Exit 190: Vail Pass Summit (near Copper Mountain) from Mile Point 180 to Mile Point 189.98. Left lane closed due to road construction. Starting July 30, 2026 at 5:00AM MDT until July 30, 2026 at about 10:00AM MDT. Full schedule below: • July 30, 5:00AM - July 30, 10:00AM Comment: Use both lanes to merge point.
Between Exit 190: Vail Pass Summit (near Copper Mountain) and Exit 180: East Vail (Vail) from Mile Point 189.98 to Mile Point 180. Left lane closed due to road construction. Starting July 30, 2026 at 5:00AM MDT until July 30, 2026 at about 10:00PM MDT. Full schedule below: • July 30, 5:00AM - July 30, 10:00PM Comment: Use both lanes to merge point.
Between 7th Street and North Rio Court (Denver) from Mile Point 297.2 to Mile Point 297.1. Right lane closed due to road construction. Starting July 30, 2026 at 12:01AM MDT until July 30, 2026 at about 11:59PM MDT. Full schedule below: • July 30, 12:01AM - July 30, 11:59PM Comment: Expect an ongoing right-lane closure on westbound Colfax Avenue. For more information, email the project at [email protected] or call the hotline, 720-902-8817.
Between Exit 256: Lookout Mountain (near Genesee) and Exit 259: Morrison Road (near Golden) from Mile Point 257 to Mile Point 258. Right shoulder closed due to technology or fiber optics repair. Starting July 30, 2026 at 12:00AM MDT until July 30, 2026 at about 11:59PM MDT. Full schedule below: • July 30, 12:00AM - July 30, 11:59PM
Between E-470 and Exit 292: US 36; Airpark Road (near Aurora) from Mile Point 289.97 to Mile Point 291.19. Both shoulders closed due to bridge construction. Starting July 30, 2026 at 12:00AM MDT until July 30, 2026 at about 11:59PM MDT. Full schedule below: • July 30, 12:00AM - July 30, 11:59PM
Between Exit 201: Frisco and Exit 205: US 6; Silverthorne (near Frisco) from Mile Point 201 to Mile Point 203. Right shoulder closed due to road construction. Starting July 30, 2026 at 12:00AM MDT until July 30, 2026 at about 11:59PM MDT. Full schedule below: • July 30, 12:00AM - July 30, 11:59PM