Skip to main content

Pitkin County Spends $3.85M on Temporary Jail Fix

Pitkin County approved a $3.85 million renovation to extend the aging jail’s life by a decade, acknowledging it is merely an interim measure pending a permanent replacement.

Published Sep 18, 2026 · 6:19 AM3 min read
Pitkin County Spends $3.85M on Temporary Jail Fix
Image source: A sign outside Pit Co jail states that the lobby is closed during construction.Genny Gottdiener/The Aspen Times

Gunnison —The sound of a sump pump kicking on in the basement of a building constructed in 1984 is a noise that should not carry the weight of municipal anxiety, yet here it is, the soundtrack to a $3.85 million renovation that everyone agrees is necessary, and everyone agrees is insufficient. It is a paradox that defines the current state of the Pitkin County Jail: we are pouring money into a foundation we know is cracked, hoping the mortar holds until we decide where to build the new house.

The obvious narrative is one of neglect — a crumbling relic of the ’80s finally getting the attention it deserves. But if you look closely, the story is less about age and more about capacity. Detentions Division Chief Dan Fellin noted that the facility currently houses 14 beds and two holding cells. During high-volume events like the X Games or the Up in the Sky music festival, the jail sees eight or nine arrests in a single night. The renovation adds four new beds, a holding cell, an in-house laundry facility, and a staff training area. It expands the footprint, yes, but it does not change the geometry of the problem. We are adding rooms to a house that is leaking.

Sheriff Michael Buglione framed the work as a bridge, stating he hopes these improvements will keep the jail running for another eight to 10 years. That timeline is the real news. It is not a fix; it is a pause. The county’s budget supplemental request admitted as much, describing the facility as "aging" and noting that these improvements are necessary to ensure the jail remains "operational, safe, and compliant in the interim." The word "interim" does a lot of heavy lifting there. It implies a future that has not yet been funded, designed, or even proposed.

The history of the jail reinforces this sense of temporary measures stacking up. Between 2021 and 2023, inmates were shuttled between Garfield and Eagle County jails before returning to Aspen after a nearly $800,000 safety upgrade in summer 2023. That earlier project added detention-grade doors, concrete bed frames, and one ADA-compliant cell. It solved the immediate safety crisis, but it did not solve the operational one. Sewage leaks and backups continued through 2024, traced to a faulty underground sewer line. Fellin pointed out that many modern jails have a grinder to handle plumbing issues, but this facility does not, and the current renovation does not add one. There are structural issues rooted in the 1984 construction that this project simply cannot touch.

So, what are we really paying for? We are paying for breathing room. We are paying for the ability to house a surge of inmates without turning people away or sending them elsewhere. We are paying for updated HVAC controls and a new surveillance system. We are paying for a place where staff can train and where inmates can attend AA meetings or meditate. These are good things. They are real improvements. But they are not a solution. They are maintenance. And maintenance, by definition, is what you do when you haven’t decided what to do next.

The permanent solution remains up in the air. That phrase is doing a lot of work. It suggests that the decision is not just unfunded, but undecided. It hasn’t been rejected; it hasn’t been approved. It is hovering. And in the meantime, the pumps are running. You can hear them in the walls, a rhythmic thrumming that reminds you the water table is rising, inch by inch, against the concrete. The renovation will hold. For now, it will hold. But the water doesn’t care about the timeline. It just keeps coming.

The Morning Briefing

Keep up with Gunnison

The day's Western Slope news, one email each morning. Free.