Projects Affecting Traffic for the Week of September 7, 2026

City of Grand Junction

Mirrored from gjcity.org, last checked September 6, 2026. This is a courtesy copy, not the official record. Confirm dates and deadlines with City of Grand Junction before acting on them.

Published September 4, 2026 Mesa County

At a glance

The City of Grand Junction lists road closures and travel restrictions for several infrastructure projects effective the week of September 7, 2026.

City of Grand Junction Projects with Travel Restrictions

Crosby Avenue Improvements Project

  • Crosby Ave. will be closed between W. Main St. and American Way.

  • Business and local traffic access will be maintained.

  • Follow all posted detour signs, traffic control devices, and directions from traffic control personnel.

Four Canyons Parkway Project

  • 25 Rd. will be closed between Flat Top Lane/Foresight Cir. to Blichmann Ave.

  • F 1/4 Road is closed to through traffic from 25 Rd. to Zenith Lane. Resident access remains open.

  • Two-way traffic on 25 Rd. is open from Patterson Rd. to Flat Top Ln. on a gravel surface.

  • 24 ¾ Rd. Northbound traffic is no longer able to pass through Four Canyons Parkway.

  • 25 Rd. Remains closed between Blichmann Ave. & F ½ Road.

  • Exercise caution when driving through the work zone; follow all posted signs, traffic control devices, and directions from traffic control personnel.

D 1/2 Rd. Capacity Improvements Project

  • D ½ Rd. will be closed between 29 Rd. and 30 Rd. Access will be maintained for local traffic.

  • Access to and from San Juan St. will be closed at the intersection of San Juan St. and D ½ Rd.

  • Detours are in place; access to San Juan is available via 29 ½ Rd. from D Rd.

  • Follow all posted detour signs, traffic control devices, and directions from traffic control personnel.

Non-City Project with Travel Restrictions

  • CDOT - Ute & Pitkin Improvements (I-70B East of Third Street Improvement Project)

  • 5th St. will be reduced to one lane between South Ave. and Colorado Ave.

  • Single-lane closures and shoulder closures will be in effect on Ute Ave. and Pitkin Ave. between 3rd St. and 6th St.

  • 4th St. will be reduced to a single lane between Colorado Ave. and Pitkin Ave.

  • All business and residential access will remain open.

  • Parking and access in alleys will remain open.

  • For questions or concerns, call 970-880-0688 or email [email protected]

  • 23 Road & Broadway Roundabout

  • Alcove Drive will be closed at 23 Rd., with detours via Vista Grande Rd. or Columbine Drive to access 23 Rd.

  • Alcove will remain closed for the duration of the project.

  • The south side of the 23 Road and Broadway intersection will reopen on Tuesday at 9 a.m. Crews have completed storm drainage upgrades in this area.

  • CO 340 will remain two-way traffic with a 35 MPH speed limit in the work zone.

  • Sidewalk access will be maintained. Please stay clear of active work areas.

  • Expect traffic delays.